Quality Assurance

Quality Control

Quality Checkpoints

Key Checks Before Equipment Delivery

01

Material Verification

Main materials, plate thickness and specified material grades are checked against the confirmed project requirements.

Material Check
02

Component Verification

Filters, pulse valves, fans, motors, discharge devices and major electrical components are checked for correct configuration.

Component Check
03

Fabrication Inspection

Welding, structural assembly, main dimensions and connection positions are reviewed during the manufacturing process.

Fabrication Check
04

Surface & Finishing Check

Surface treatment, coating, corrosion protection and overall appearance are checked according to the project specification.

Finishing Check
05

Functional & Final Inspection

Major functions, equipment completeness, electrical configuration and final delivery condition are checked before shipment.

Final Check
06

Packing Verification

Equipment, accessories, project documents, package markings and transport protection are confirmed before release.

Packing Check
Pre-Shipment Inspection

Final Inspection Before Shipment

Before release for shipment, the completed equipment is checked against the confirmed project configuration and delivery requirements.

Overall equipment dimensions and main connection positions
Main equipment and component configuration
Filter quantity, size and specification
Fan, motor and electrical component information
Accessories, spare parts and supplied components
Nameplates, labels and package markings
Surface condition, coating and overall appearance
Packing list and final shipment contents
Documentation

Inspection Records & Project Documentation

01

Equipment Inspection Photos

02

Packing Photos

03

Inspection Records

04

Equipment Drawings

05

Packing List

06

Operation & Maintenance Manuals

07

Component Documents

08

Certificates Where Applicable

Third-Party Inspection

Third-Party Inspection Can Be Arranged

For projects with specific inspection requirements, customer representatives or third-party inspection agencies can participate before shipment. The inspection scope and acceptance criteria should be confirmed in advance.

01

Customer Inspection

Customer representatives can attend the agreed pre-shipment inspection when required.

02

Third-Party Agency

Independent inspection agencies can be arranged according to project requirements.

03

Agreed Checklist

Inspection items and acceptance criteria can be confirmed before production or inspection.

04

FAT Where Applicable

Factory acceptance testing can be coordinated where applicable and agreed within the project scope.

Project Quality Requirements

Have Specific Inspection Requirements for Your Project?

Share your inspection standards, acceptance criteria or project quality requirements with us before production so they can be reviewed and confirmed within the project scope.

Discuss Your Requirements

PROJECT INQUIRY

Tell Us About Your Dust Collection Project

Novazure General Inquiry Form